| 
         
          |  | Material:2A12 Equipment:5-axial blocking plant
 Method processing : modeling and automatically programming impeller 
            space surface should be finished by larger interactive CAD/CAM software 
            on Unigraphics. Milling impeller should be finished by 5-axial blocking 
            plant to meet with the of requirement on size parameter in impeller 
            sections.
 
 |  |